9+ Boeing Holiday Calendar 2025 PDF & Download


9+ Boeing Holiday Calendar 2025 PDF & Download

A schedule of planned non-working days for the Boeing Company in the year 2025 represents a vital resource for employees, contractors, and stakeholders. This schedule typically includes company holidays, planned shutdown periods, and other significant dates impacting operations. An example might be a list of dates encompassing holidays like New Year’s Day, Independence Day, Thanksgiving, and Christmas, as well as any company-specific observances.

Access to this information facilitates effective planning and coordination for all involved parties. Employees can schedule vacations and personal appointments accordingly, minimizing disruptions. Contractors and suppliers can align their schedules with Boeing’s operational calendar, ensuring timely delivery of goods and services. Historical context demonstrates the ongoing evolution of these calendars, reflecting changes in societal norms, labor laws, and company-specific needs. Predictable schedules contribute to improved employee morale and enhanced operational efficiency.

The following sections will delve into specific aspects of the company’s annual schedule, including anticipated holiday dates, potential factory shutdown periods, and resources for accessing the most up-to-date information. Further discussion will address the impact of this schedule on various stakeholder groups and the broader implications for business operations.

1. Official Company Holidays

Official company holidays form the core of the Boeing holiday calendar for 2025. These designated non-working days influence scheduling across various departments and impact overall operations. Understanding these holidays is crucial for effective planning by employees, contractors, and stakeholders.

  • Federal Holidays

    Federal holidays, such as New Year’s Day, Independence Day, and Christmas, are typically observed by Boeing. These dates are consistent across the United States and provide a baseline for the company’s annual calendar. Observance of these holidays ensures compliance with national legal requirements and aligns with broader societal norms.

  • Company-Specific Holidays

    In addition to federal holidays, Boeing may observe company-specific holidays. These could include days significant to the company’s history or dedicated to employee recognition. These dates can vary annually and contribute to a distinct company culture. Knowledge of these dates aids in internal coordination and fosters a sense of shared identity within the organization.

  • Floating Holidays

    Some companies offer floating holidays, allowing employees to choose a non-working day based on personal preferences. This flexibility empowers employees to observe religious or cultural holidays not included in the standard calendar. Inclusion of floating holidays in the annual calendar reflects a commitment to diversity and inclusion within the workforce. Potential impacts on operational continuity during popular floating holiday periods require consideration and planning.

  • Holiday Pay Eligibility

    Specific regulations determine employee eligibility for holiday pay. Factors such as employment status (full-time, part-time, contractor) and collective bargaining agreements influence holiday pay calculations. Understanding these policies is essential for accurate payroll processing and transparent communication with employees. Variations in holiday pay policies can exist across different Boeing locations or employee categories based on local legal requirements and specific agreements.

Accurate information regarding official company holidays is essential for interpreting the Boeing holiday calendar 2025. This understanding facilitates informed decision-making related to project timelines, resource allocation, and personal scheduling, ultimately contributing to smoother operations and improved employee satisfaction.

2. Planned Shutdown Periods

Planned shutdown periods represent a significant component of the Boeing holiday calendar for 2025. These temporary cessations of operations serve various crucial functions, ranging from facility maintenance and equipment upgrades to inventory management and cost reduction. Their strategic placement within the annual calendar necessitates careful consideration and impacts numerous stakeholders. A cause-and-effect relationship exists between planned shutdowns and overall operational efficiency. For instance, a planned shutdown during a period of traditionally lower demand can minimize disruptions to production while allowing essential maintenance to occur. This proactive approach can prevent more costly, unplanned downtime later in the year. Conversely, an ill-timed shutdown could negatively impact production targets and customer deliveries. Real-world examples include scheduled shutdowns for facility-wide equipment upgrades or the integration of new technologies. These periods, while temporarily halting production, ultimately contribute to long-term improvements in efficiency and safety.

Understanding the rationale behind planned shutdown periods offers practical significance. Suppliers can adjust delivery schedules, minimizing potential storage costs and ensuring components are available when production resumes. Employees can coordinate vacation time, maximizing personal time off while minimizing disruption to operations. Furthermore, planned shutdowns can be leveraged for employee training and development activities, enhancing skills and promoting professional growth. Analyzing historical data on the effectiveness of past shutdowns informs future planning, enabling the company to optimize the timing and duration of these periods for maximum benefit.

In summary, planned shutdown periods are not merely breaks in the calendar; they are strategically implemented intervals crucial for maintaining and enhancing operational efficiency. Their careful integration into the Boeing holiday calendar for 2025 demonstrates a proactive approach to long-term operational excellence. Challenges remain in balancing the benefits of planned shutdowns with potential short-term disruptions. However, effective communication, detailed planning, and continuous evaluation contribute to maximizing the positive impact of these essential operational pauses. This understanding is integral for all stakeholders interacting with Boeing’s production and delivery schedules.

3. Employee Vacation Scheduling

Effective employee vacation scheduling is intrinsically linked to the Boeing holiday calendar for 2025. This calendar serves as a foundational resource for employees planning their time off, enabling them to align personal schedules with company holidays and planned shutdown periods. A clear understanding of the calendar allows employees to maximize vacation time by coordinating it with existing non-working days, minimizing disruption to ongoing projects and team workflows. For example, an employee aware of a planned shutdown period in July might schedule vacation time around those dates, effectively extending their time off without significantly impacting project timelines.

The interplay between individual vacation scheduling and the broader company calendar creates a ripple effect across the organization. Departments must consider anticipated vacation requests when allocating resources and assigning responsibilities. This proactive approach helps maintain operational continuity during peak vacation seasons. Predictive analytics, utilizing historical vacation data and the 2025 holiday calendar, can assist in forecasting potential staffing shortages and informing proactive recruitment or temporary staffing strategies. Furthermore, a well-managed vacation scheduling process contributes to improved employee morale and reduced burnout. When employees can successfully integrate their personal time off with the company’s operational calendar, it fosters a sense of work-life balance, ultimately benefiting both the individual and the organization.

In conclusion, employee vacation scheduling is not an isolated process but an integral component of the Boeing holiday calendar for 2025. Successfully navigating this interplay requires clear communication, accessible scheduling tools, and a proactive approach to resource allocation. Challenges may arise due to unforeseen circumstances requiring schedule adjustments, but a robust and flexible system can mitigate disruptions. The practical significance of understanding this connection is clear: a well-managed vacation scheduling process contributes to a more productive, efficient, and satisfied workforce, directly impacting the company’s operational success. This understanding is crucial not only for individual employees but also for managers, human resources departments, and any stakeholders involved in workforce planning and resource allocation.

4. Contractor Coordination

Contractor coordination relies heavily on the Boeing holiday calendar for 2025. Successful project execution hinges on aligning contractor availability with Boeing’s operational schedule, including holidays and planned shutdowns. This coordination minimizes potential delays and ensures project continuity. Effective integration of contractor schedules with the company calendar streamlines workflows and optimizes resource allocation.

  • Project Timeline Alignment

    Aligning contractor schedules with project timelines, as defined by Boeing’s 2025 calendar, ensures timely completion of tasks. For example, scheduling critical contractor activities outside of planned shutdown periods prevents unnecessary delays. Clear communication of holiday schedules and shutdown periods to contractors facilitates proactive planning and resource allocation. This alignment minimizes the risk of project slippage and cost overruns.

  • Resource Availability

    Coordination with the Boeing holiday calendar ensures the availability of necessary resources for contractors. This includes access to facilities, equipment, and support staff. For instance, scheduling contractor activities during periods of low internal Boeing activity can maximize resource availability. Understanding potential resource constraints during peak periods or planned shutdowns allows for proactive mitigation strategies, such as alternative resource allocation or schedule adjustments.

  • Security and Access Protocols

    Contractor access to Boeing facilities often requires adherence to specific security protocols. The holiday calendar influences these protocols, as access procedures may vary during holidays or shutdown periods. For example, heightened security measures during company holidays might necessitate advance contractor badging or escort requirements. Communicating these variations in advance ensures compliance and minimizes access delays for contractors.

  • Cost Management

    Integrating contractor schedules with the Boeing holiday calendar contributes to effective cost management. Minimizing downtime caused by scheduling conflicts reduces unnecessary expenses. For example, scheduling contractor work during planned shutdowns, when regular operations are already paused, may offer cost advantages compared to scheduling during normal operations, which might require additional coordination and potential disruptions. Careful coordination also helps optimize resource utilization, minimizing idle time and maximizing the value derived from contracted services.

In conclusion, contractor coordination and the Boeing holiday calendar for 2025 are inextricably linked. Successful project outcomes depend on meticulous alignment of contractor activities with Boeing’s operational schedule. This integration optimizes resource utilization, minimizes delays, enhances security, and contributes to effective cost management. Understanding the nuances of this relationship is essential for all stakeholders involved in managing and executing projects involving external contractors, highlighting the critical role of the holiday calendar in facilitating seamless collaboration and achieving operational objectives.

5. Production Schedules

Production schedules at Boeing are inextricably linked to the 2025 holiday calendar. The calendar dictates non-working days, directly impacting achievable production targets and delivery timelines. Planned shutdowns, embedded within the holiday calendar, necessitate adjustments to production schedules, often requiring ramp-up or ramp-down periods to mitigate disruptions. This cause-and-effect relationship underscores the importance of the holiday calendar as a foundational element of production planning. For instance, aircraft assembly lines might reduce output in the weeks preceding a planned shutdown, allowing for the safe and orderly cessation of operations, and then gradually increase production following the shutdown. Similarly, holiday periods impact the availability of the workforce, requiring careful allocation of resources to maintain essential production activities while accommodating employee time off.

The practical significance of this connection is evident in several areas. Accurate production schedules, informed by the holiday calendar, enable realistic delivery commitments to customers. Supply chain management relies on these schedules to ensure timely delivery of parts and materials, minimizing inventory holding costs and preventing production bottlenecks. Furthermore, understanding the interplay between production schedules and the holiday calendar facilitates effective workforce management, allowing for optimized staffing levels throughout the year. Real-world examples include adjusting shift patterns or implementing cross-training programs to address potential staffing shortages during peak holiday seasons or planned shutdowns. This proactive approach minimizes disruptions and ensures consistent production output.

In summary, the Boeing holiday calendar for 2025 is not merely a list of non-working days but a critical input for developing realistic and achievable production schedules. Effective integration of the calendar into production planning processes is essential for meeting customer demands, optimizing supply chain efficiency, and managing workforce resources. Challenges remain in balancing production demands with the need for employee time off and planned maintenance activities. However, a well-defined holiday calendar, combined with robust planning processes and effective communication, enables Boeing to navigate these complexities and maintain a consistent and efficient production flow. This understanding is crucial for all stakeholders involved in the production process, from shop floor employees to senior management, highlighting the integral role of the holiday calendar in driving operational success.

6. Supply Chain Impacts

The Boeing holiday calendar for 2025 significantly impacts supply chain operations. Planned shutdowns and holidays influence delivery schedules, inventory management, and overall supply chain flow. Understanding these impacts is crucial for suppliers and Boeing’s internal logistics teams to maintain production continuity and minimize disruptions. A cause-and-effect relationship exists between the holiday calendar and supply chain activities. For example, a planned shutdown requires suppliers to adjust delivery schedules to avoid material accumulation during non-production periods. This necessitates careful coordination and communication to ensure timely delivery when production resumes, preventing potential bottlenecks or delays. Similarly, holiday periods can affect transportation networks and customs clearance processes, potentially impacting the timely arrival of internationally sourced components.

Real-world examples illustrate this connection. Suppliers of engine components might need to adjust their production schedules to align with Boeing’s planned shutdown periods, ensuring that engines are available for installation when aircraft assembly resumes. Logistics providers must consider holiday traffic volumes and potential customs delays when scheduling international shipments of critical parts. Effective inventory management is essential to navigate these periods. Boeing might increase inventory levels of certain components before a planned shutdown to mitigate supply disruptions. Conversely, suppliers might reduce production of specific parts to avoid excess inventory during non-production periods. This delicate balancing act requires precise coordination and accurate demand forecasting. The practical significance of this understanding lies in minimizing supply chain disruptions and associated costs. Efficient management of delivery schedules reduces inventory holding costs, prevents production delays, and ultimately contributes to on-time aircraft deliveries.

In summary, the Boeing holiday calendar for 2025 is a critical factor influencing supply chain operations. Effective coordination between Boeing and its suppliers, coupled with proactive inventory management and logistical planning, are essential for mitigating potential disruptions. Challenges remain in accurately forecasting demand and adapting to unforeseen circumstances, such as supplier production issues or transportation delays. However, a well-defined holiday calendar, combined with robust supply chain management practices, enables Boeing to navigate these complexities and maintain a resilient and efficient supply chain, ensuring the continued flow of materials and components necessary for its production processes. This understanding is crucial for all stakeholders involved in the supply chain, from raw material providers to final assembly teams, reinforcing the integral role of the holiday calendar in supporting overall operational success.

7. Customer Deliveries

Customer deliveries of Boeing products are significantly influenced by the 2025 holiday calendar. This calendar, encompassing planned shutdowns and holidays, directly impacts production schedules and subsequently, delivery timelines. Understanding this connection is crucial for managing customer expectations and maintaining strong client relationships. The holiday calendar acts as a critical input for determining realistic delivery dates, enabling proactive communication with customers and minimizing potential disruptions.

  • Production Schedule Adherence

    The holiday calendar influences production schedules, which directly impact customer delivery dates. Planned shutdowns necessitate adjustments to production timelines, potentially affecting delivery schedules. Effective management of production schedules, informed by the holiday calendar, ensures adherence to delivery commitments and minimizes customer impact. For instance, if a planned shutdown overlaps with a critical production phase for a customer’s aircraft, proactive communication and schedule adjustments become essential to maintain delivery timelines.

  • Delivery Timeline Management

    Accurate delivery timeline management relies heavily on the holiday calendar. Holidays and planned shutdowns influence logistics and transportation availability, impacting delivery windows. Incorporating these factors into delivery planning allows for realistic delivery date estimations and proactive communication with customers. For example, international deliveries might experience delays due to customs closures during holiday periods, necessitating adjustments to shipping schedules and proactive customer notification.

  • Customer Communication and Expectation Management

    The holiday calendar plays a vital role in managing customer expectations. Proactive communication of potential delivery impacts due to holidays or planned shutdowns fosters transparency and strengthens customer relationships. Clear and timely updates regarding any schedule adjustments build trust and minimize potential dissatisfaction. For instance, informing a customer in advance about a potential delivery delay due to a planned shutdown allows them to adjust their own operational schedules accordingly, minimizing disruption.

  • Post-Delivery Support and Services

    The holiday calendar can also influence post-delivery support and services. Availability of technical support staff and spare parts might be affected during holidays or planned shutdowns. Communicating these potential impacts to customers and establishing contingency plans ensures continued support and minimizes disruption to their operations. For example, providing customers with alternative contact points or expedited spare parts delivery options during holiday periods demonstrates proactive customer service and mitigates potential downtime.

In conclusion, the Boeing holiday calendar for 2025 is integral to managing customer deliveries effectively. Understanding the calendar’s impact on production schedules, delivery timelines, and post-delivery support enables proactive communication, realistic expectation management, and strong customer relationships. Challenges remain in balancing production demands with holiday periods and planned shutdowns, but effective planning and transparent communication mitigate potential disruptions. This interconnectedness highlights the critical role of the holiday calendar in ensuring customer satisfaction and maintaining a positive brand image.

8. Financial Planning

Financial planning at Boeing is intrinsically linked to the 2025 holiday calendar. The calendar, encompassing holidays and planned shutdown periods, influences various financial aspects, including labor costs, production output, and revenue projections. Understanding this connection is crucial for accurate budgeting, forecasting, and resource allocation. The calendar serves as a key input for financial models, enabling more precise predictions of financial performance throughout the year.

  • Labor Cost Management

    Holiday pay, overtime compensation during shutdown periods, and vacation accrual payouts are all influenced by the holiday calendar. Accurate accounting for these factors enables precise budgeting for labor costs. For example, a high concentration of holidays in a particular quarter might lead to increased holiday pay expenses, requiring adjustments to budget allocations. Similarly, planned shutdowns might necessitate overtime pay for essential personnel involved in maintenance or preparatory activities. Accurately forecasting these costs ensures appropriate financial provisions.

  • Production Output and Revenue Projections

    Planned shutdowns and holidays directly impact production output. Reduced production during these periods influences revenue projections and requires adjustments to financial forecasts. For instance, a prolonged shutdown during a peak production period could significantly impact revenue generation, necessitating revisions to annual financial targets. Accurately incorporating the holiday calendar into production and revenue models allows for more realistic financial planning.

  • Capital Expenditure Planning

    Planned shutdowns often coincide with periods of major maintenance or capital expenditure projects. Aligning these activities with the holiday calendar allows for efficient resource allocation and minimizes disruptions to ongoing operations. For example, scheduling major equipment upgrades during a planned shutdown avoids costly downtime during regular production periods. This strategic alignment optimizes capital expenditure utilization and minimizes overall project costs.

  • Cash Flow Management

    The holiday calendar influences cash flow patterns. Periods of reduced production and increased holiday pay can impact cash outflow, while periods of high production and deliveries influence cash inflow. Understanding these fluctuations enables proactive cash flow management, ensuring sufficient liquidity to meet financial obligations. For example, anticipating a period of reduced cash inflow during a planned shutdown allows for proactive measures such as adjusting payment schedules or securing short-term financing to maintain a healthy cash balance.

In conclusion, the Boeing holiday calendar for 2025 plays a significant role in financial planning. Integrating the calendar into financial models and forecasting processes enables accurate budgeting, resource allocation, and cash flow management. This understanding is crucial for maintaining financial stability and achieving business objectives. The complexities of aligning production schedules, labor costs, and revenue projections with the holiday calendar require careful planning and analysis, but ultimately contribute to sound financial decision-making and sustainable financial performance.

9. Regulatory Compliance

Regulatory compliance forms an essential aspect of the Boeing holiday calendar for 2025. The calendar’s structure must reflect adherence to various labor laws and regulations governing working hours, holiday pay, and employee leave. This interconnectedness ensures legal compliance and protects employee rights. A cause-and-effect relationship exists between regulatory requirements and the holiday calendar’s design. For example, mandatory minimum holiday entitlements influence the number of designated holidays within the calendar. Regulations regarding overtime pay during holiday periods necessitate clear delineation of holiday dates and working hours within the calendar structure. Real-world examples include compliance with the Fair Labor Standards Act (FLSA) in the United States, which dictates overtime pay rules, and similar regulations in other jurisdictions where Boeing operates. Non-compliance can lead to legal penalties and reputational damage, highlighting the practical significance of integrating regulatory considerations into the holiday calendar development process.

Further analysis reveals the practical implications of this connection. Accurate tracking of employee working hours during holiday periods, facilitated by a compliant holiday calendar, ensures accurate payroll calculations and adherence to wage and hour regulations. Provisions for employee leave, including vacation time and sick leave, must align with legal requirements outlined in relevant labor laws. The holiday calendar serves as a tool for managing and tracking these entitlements, ensuring compliance and promoting transparency. Collective bargaining agreements, where applicable, further influence the holiday calendar, often specifying additional holiday entitlements or specific pay rules for work performed during holidays. Integrating these provisions into the calendar ensures adherence to contractual obligations and fosters positive labor relations. Real-world examples include union agreements dictating premium pay rates for work performed on specific holidays or provisions for additional paid time off based on seniority.

In conclusion, regulatory compliance is not a peripheral concern but an integral component of the Boeing holiday calendar for 2025. A compliant calendar protects employee rights, ensures adherence to legal obligations, and mitigates potential legal risks. Challenges arise from the complexity and evolving nature of labor laws across different jurisdictions, requiring diligent monitoring and adaptation. However, prioritizing regulatory compliance in the calendar’s design fosters a culture of legal adherence, promotes fair labor practices, and contributes to a positive organizational reputation. This understanding is crucial for human resources departments, legal counsel, and any stakeholders involved in developing and implementing company policies related to working hours, holidays, and employee leave, reinforcing the critical role of the holiday calendar in maintaining legal and ethical operations.

Frequently Asked Questions

This section addresses common inquiries regarding the Boeing holiday calendar for 2025. Clarity on these points promotes effective planning and ensures all stakeholders remain well-informed.

Question 1: Where can the most up-to-date version of the 2025 holiday calendar be accessed?

Official company communication channels, such as internal websites or human resources portals, typically provide the most accurate and current calendar version. Consulting these resources is recommended to ensure access to the latest information.

Question 2: How are potential changes or revisions to the holiday calendar communicated?

Updates are generally disseminated through official company communication channels. Employees and relevant stakeholders should monitor these channels for any revisions or announcements regarding the holiday schedule.

Question 3: How do planned shutdown periods affect contractor access to Boeing facilities?

Access procedures during planned shutdowns may vary. Contractors should consult their Boeing points of contact for specific access guidelines and security protocols during these periods.

Question 4: What is the process for requesting vacation time during peak periods or around planned shutdowns?

Established company procedures typically govern vacation requests. Employees should consult internal policies or their respective managers for guidance on submitting vacation requests, particularly during high-demand periods.

Question 5: How does the holiday calendar influence production targets and delivery timelines?

The holiday calendar, including planned shutdowns, directly impacts production schedules. These adjustments influence delivery timelines and overall production output. Project managers and supply chain teams incorporate these factors into planning processes to mitigate potential disruptions.

Question 6: Where can employees find clarification on holiday pay eligibility and calculation methods?

Internal human resources documentation or payroll departments offer detailed information regarding holiday pay policies. Employees should consult these resources for specific guidance on eligibility criteria and calculation methods.

Understanding the nuances of the Boeing holiday calendar for 2025 is crucial for all stakeholders. Consulting official company resources and maintaining open communication ensures access to the most accurate and up-to-date information, facilitating effective planning and contributing to smooth operations throughout the year.

For further details and specific inquiries, consulting official company resources or designated points of contact is recommended. The subsequent section offers additional information on relevant policies and procedures.

Tips for Utilizing the 2025 Holiday Calendar

Maximizing the benefits of the Boeing holiday calendar requires proactive planning and a clear understanding of its implications. The following tips provide guidance for effectively navigating the 2025 calendar.

Tip 1: Proactive Planning
Early consultation of the holiday calendar is crucial. Proactive planning allows for timely vacation scheduling, project timeline adjustments, and coordination with contractors. This minimizes potential conflicts and ensures smoother operations.

Tip 2: Coordination with Stakeholders
Open communication with relevant stakeholders, including suppliers, contractors, and internal teams, is essential. Sharing calendar details facilitates synchronized scheduling and minimizes potential disruptions.

Tip 3: Resource Allocation
The holiday calendar informs resource allocation decisions. Understanding anticipated absences during holidays and planned shutdowns enables effective staffing and resource management, ensuring operational continuity.

Tip 4: Budgetary Considerations
Holiday pay, potential overtime costs, and reduced production during shutdowns influence financial planning. Integrating the holiday calendar into budget development ensures accurate financial forecasting and resource allocation.

Tip 5: Contingency Planning
Unforeseen circumstances may necessitate adjustments to schedules. Developing contingency plans for potential disruptions ensures flexibility and minimizes the impact of unexpected events.

Tip 6: Regular Calendar Review
Periodic review of the holiday calendar is essential, as updates or revisions might occur. Staying informed about any changes ensures continued alignment of plans and schedules.

Tip 7: Leverage Technology
Utilizing scheduling software or project management tools, integrated with the holiday calendar, streamlines coordination, automates reminders, and enhances overall planning efficiency. This integration minimizes scheduling conflicts and improves communication among stakeholders.

Integrating these tips into planning processes optimizes resource utilization, enhances coordination, and minimizes potential disruptions. Effective use of the holiday calendar contributes to improved operational efficiency and successful project execution.

By understanding and implementing these strategies, stakeholders can effectively navigate the 2025 calendar and maximize its benefits. The following conclusion summarizes key takeaways and reinforces the importance of proactive engagement with the holiday schedule.

Conclusion

This exploration of the Boeing holiday calendar for 2025 underscores its significance as a critical operational tool. Effective utilization requires a comprehensive understanding of its various facets, from holiday designations and planned shutdowns to their impact on production schedules, supply chain activities, customer deliveries, and financial planning. Regulatory compliance considerations further emphasize the calendar’s importance in ensuring adherence to legal obligations and protecting employee rights. Proactive planning, consistent communication, and strategic resource allocation are essential for maximizing the calendar’s benefits and mitigating potential disruptions.

The Boeing holiday calendar for 2025 represents more than a simple schedule; it serves as a roadmap for operational success. Its strategic integration into planning processes enables informed decision-making, optimized resource utilization, and enhanced coordination across all stakeholder groups. This proactive approach strengthens operational resilience, fosters a culture of preparedness, and ultimately contributes to the successful achievement of business objectives throughout the year. Continued engagement with and adaptation to this evolving schedule will remain essential for navigating the complexities of the upcoming year.